So far, we have finished the base of the robot.
Today we made the frame that holds the battery, drilled the holes for the compressor case on the rear of the robot, and assembled the second forklift. This special forklift was sent out to have special parts machined and attached by Tyco, one of our sponsors.
No comments:
Post a Comment